An assembly line consists of 158 tasks grouped into 32 workstations.The sum of all task times is 105 minutes.The largest assigned cycle time is 4 minutes.What is the efficiency of this line?


A) 8 percent
B) 21 percent
C) 82 percent
D) 100 percent
E) 81 percent

Correct Answer

verifed

verified

A hospital's layout most closely resembles which of the following?


A) product oriented
B) work cell
C) job shop
D) project
E) retail

Correct Answer

verifed

verified

A(n)________ groups workers,their equipment,and spaces/offices to provide for comfort,safety,and movement of information.

Correct Answer

verifed

verified

A fabrication line and an assembly line are both types of repetitive and product-focused layout,but only the fabrication line utilizes workstations.

Correct Answer

verifed

verified

Assembly line balancing has just been used to solve a product layout problem.Two solutions look especially attractive to the plant managers.Both solutions make the same output per day,and both have the same number of workstations.The managers were going to break the tie by looking at line efficiency,but discovered that both lines had the same efficiency as well.Should they have been surprised at this? Explain.

Correct Answer

verifed

verified

No,they should not be surprised.Efficien...

View Answer

For which of the following operations would a fixed-position layout be MOST appropriate?


A) assembling automobiles
B) producing TV sets
C) constructing a highway tunnel
D) refining of crude oil
E) running an insurance agency

Correct Answer

verifed

verified

An assembly line has been designed to make battery-powered beverage mixers.Task details are shown in the table below: An assembly line has been designed to make battery-powered beverage mixers.Task details are shown in the table below:    a.What is the assigned cycle time (in minutes)? b.What is the maximum output rate of this line in mixers per hour? c.What is the total idle time per cycle? d.What is the assembly line's efficiency? a.What is the assigned cycle time (in minutes)? b.What is the maximum output rate of this line in mixers per hour? c.What is the total idle time per cycle? d.What is the assembly line's efficiency?

Correct Answer

verifed

verified

Cycle time is 4.0 minutes (gov...

View Answer

The layout approach that addresses trade-offs between space and material handling is called the fixed-position layout.

Correct Answer

verifed

verified

A process layout problem consists of 4 departments,each of which can be assigned to one of four rooms.The number of different solutions to this problem is ________,although all of them may not have different material handling costs.


A) 1
B) 4
C) 16
D) 24
E) unknown

Correct Answer

verifed

verified

Identify the seven fundamental layout strategies.Describe the use of each one very briefly.

Correct Answer

verifed

verified

1.Office layout: Positions workers,their...

View Answer

Which of the following is TRUE of random stocking?


A) Because items are stocked randomly,accurate inventory records are not necessary.
B) Its results always minimize handling costs.
C) Products have their own permanent storage spot.
D) Each pick can be of only one product.
E) None of the above is true.

Correct Answer

verifed

verified

The typical goal used when developing a process-oriented layout strategy is to:


A) minimize the distance between adjacent departments.
B) minimize the material handling costs.
C) maximize the number of different tasks that can be performed by an individual machine.
D) minimize the level of operator skill necessary.
E) maximize job specialization.

Correct Answer

verifed

verified

You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below. You have been asked to balance a flow shop assembly operation to achieve an output rate of 80 units per eight-hour day.Task times and precedence relationships are shown in the table below.    a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using the most following tasks heuristic. e.What is the efficiency of the line obtained in part d? a.Draw the precedence diagram. b.Determine the desired cycle time. c.Determine the theoretical minimum number of stations needed. d.Balance this line using the most following tasks heuristic. e.What is the efficiency of the line obtained in part d?

Correct Answer

verifed

verified

The precedence diagram appears...

View Answer

Which of the following is NOT one of McDonald's "seven major innovations"?


A) the Happy Meal
B) drive-through windows
C) breakfast menus
D) play areas
E) self-service kiosks

Correct Answer

verifed

verified

An electronics manufacturer makes remote control devices for interactive-cable-TV systems.The following assembly tasks must be performed on each device. An electronics manufacturer makes remote control devices for interactive-cable-TV systems.The following assembly tasks must be performed on each device.    a.Draw the precedence diagram for this problem. b.What is the sum of the task times? c.What cycle time will allow the production of 200 units over a ten-hour day? d.What is the theoretical number of workstations needed? e.Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time. f.How do these two solutions differ? Which do you prefer;why? a.Draw the precedence diagram for this problem. b.What is the sum of the task times? c.What cycle time will allow the production of 200 units over a ten-hour day? d.What is the theoretical number of workstations needed? e.Balance this assembly line using the heuristic most following tasks and the heuristic longest operation time. f.How do these two solutions differ? Which do you prefer;why?

Correct Answer

verifed

verified

The sum of the task times is 4.05 minute...

View Answer

Which of the following is NOT a heuristic rule for assigning tasks to workstations in a product layout?


A) longest tasks first
B) in order of most number of following tasks
C) median tasks first
D) shortest tasks first
E) in accordance with positional weight

Correct Answer

verifed

verified

In what specific areas does the layout decision establish a firm's competitive priorities?

Correct Answer

verifed

verified

Layout decisions establish a f...

View Answer

Cycle time is the maximum time that the product is allowed at each workstation.

Correct Answer

verifed

verified

The minimum number of workstations depends upon the set of task times and the precedence chart,but not the number of units scheduled.

Correct Answer

verifed

verified

A firm is planning to set up an assembly line to assemble 40 units per hour,and 57 minutes per hour are productive.The time to perform each task and the tasks that precede each task are contained in the following table. A firm is planning to set up an assembly line to assemble 40 units per hour,and 57 minutes per hour are productive.The time to perform each task and the tasks that precede each task are contained in the following table.    (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in minutes. (c)Compute the theoretical minimum number of workstations required to produce 40 units per hour. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part d? (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in minutes. (c)Compute the theoretical minimum number of workstations required to produce 40 units per hour. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part d?

Correct Answer

verifed

verified

(a)The appropriate diagram appears below...