Correct Answer
verified
View Answer
Multiple Choice
A) Gantt charts give a timeline and precedence relationships for each activity of a project.
B) Gantt charts use the four standard spines of Methods,Materials,Manpower,and Machinery.
C) Gantt charts are visual devices that show the duration of activities in a project.
D) Gantt charts are expensive.
E) All of the above are true.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) The shortest of all paths through the network is the critical path.
B) Some activities on the critical path may have slack.
C) Every network has only one critical path.
D) On a specific project,there can be multiple critical paths,all with exactly the same duration.
E) The duration of the critical path is the average duration of all paths in the project network.
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) work break schedule
B) work breakdown status
C) work breakdown schedule
D) work breakdown structure
E) work break status
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) Crashing is not possible unless there are multiple critical paths.
B) Crashing a project often reduces the length of long-duration,but noncritical,activities.
C) Activities not on the critical path can never be on the critical path,even after crashing.
D) Crashing shortens the project duration by assigning more resources to one or more of the critical tasks.
E) The crash time always exceeds the normal time.
Correct Answer
verified
True/False
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) The critical path is D-E-F,duration 15.
B) The critical path is D-F,duration 12.
C) Slack at D is 3 periods.
D) Slack at E is 3 periods.
E) Both A and C are true.
Correct Answer
verified
Multiple Choice
A) resources
B) costs
C) quality
D) budgets
E) all of the above
Correct Answer
verified
Multiple Choice
A) near zero
B) 0.0126
C) 0.1587
D) 0.8413
E) 2.14
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Multiple Choice
A) fixed project organization.
B) matrix organization.
C) normal organization.
D) standard organization.
E) permanent project organization.
Correct Answer
verified
Multiple Choice
A) Project Panther
B) Project Pit Bull
C) Project Python
D) Project Piranha
E) Project Phoenix
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Showing 101 - 120 of 120