The larger the capacity cushion the better.

Correct Answer

verifed

verified

A production facility works best when it focuses on a fairly limited set of production objectives.

Correct Answer

verifed

verified

Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons?


A) Intermediate-range
B) Long-range
C) Short-range
D) Current
E) Upcoming

Correct Answer

verifed

verified

The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's long-range competitive strategy.

Correct Answer

verifed

verified

Capacity flexibility means having the ability to rapidly increase or decrease production levels, or to shift production capacity quickly from one product or service to another.

Correct Answer

verifed

verified

A capacity cushion is the amount of capacity less than expected demand.

Correct Answer

verifed

verified

Which of the following is not a step used in determining production capacity requirements?


A) Forecasting to predict product sales
B) Forecasting raw material usage
C) Projecting availability of labor
D) Calculating equipment and labor needs
E) Projecting equipment availability

Correct Answer

verifed

verified

In solving a decision tree problem, calculations start at the ends of the "branches" of the tree and work backwards to the base of the tree.

Correct Answer

verifed

verified

The capacity cushion is the ratio of capacity used to the best capacity level.

Correct Answer

verifed

verified

In designing a general service facility, capacity should be such that the target rate of service utilization (ρ) , in order to get the best general-purpose design, should be


A) less than 0.6 (or 60%) , so that your system would be within the zone of service with maximum possible utilization within that.
B) more than 0.6 (or 60%) so that your system would have a good utilization.
C) about 0.7 (70%) so that your system would be in the zone of service with maximum possible utilization within that.
D) more than 1.0 (100%) so that the servers are fully utilized, even if the customers had to wait a little.
E) between 0.9 (90%) and 1.0 (100%) so that the utilization of the system is ideal.

Correct Answer

verifed

verified

The objective of strategic capacity planning is to provide an approach for determining the overall capacity level of labor-intensive resources.

Correct Answer

verifed

verified

A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.

Correct Answer

verifed

verified

Precise capacity design or the rate of service utilization (ρ) , is application specific.


A) It could be close to 100% for a sports arena.
B) It could be as low as 0.5 for hospital emergency room.
C) As the degree of uncertainty in demand increases, higher ρ may be appropriate.
D) All of the above choices are correct.
E) Both it could be close to 100% for a sports arena and it could be as low as 0.5 for hospital emergency room.

Correct Answer

verifed

verified

When deciding to add capacity to a factory which of the following need not be considered?


A) Maintaining system balance
B) The frequency of capacity additions
C) Use of external capacity
D) Immediate product demand
E) Availability of raw materials

Correct Answer

verifed

verified

At a decision point in a decision tree, which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000 with a probability of 90%; the expected benefit of selecting machine B is $80,000 with a probability of 50% and the expected benefit of selecting machine C is $60,000 with a probability of 75%?


A) Machine A
B) Machine B
C) Machine C
D) You would be indifferent between machines A and C
E) You would be indifferent between machines A and B

Correct Answer

verifed

verified

What is an important difference between capacity planning in services as contrasted to capacity planning in manufacturing operations?


A) Time
B) Location
C) Demand volatility
D) Utilization impacts service quality
E) All of these

Correct Answer

verifed

verified

In practice achieving a perfectly balanced plant is usually both impossible and undesirable.

Correct Answer

verifed

verified

Capacity planning is generally viewed in three time durations: Immediate, Intermediate, and Indeterminate.

Correct Answer

verifed

verified

At some point, the size of a growing plant can become too large and diseconomies of scale becomes a capacity planning problem.

Correct Answer

verifed

verified

Capacity planning that involves hiring, layoffs, some new tooling, minor equipment purchases, and subcontracting is considered as which one of the following planning horizons?


A) Intermediate range
B) Long range
C) Short range
D) Current
E) Upcoming

Correct Answer

verifed

verified