The master production schedule (MPS) details how many end items will be produced within specified periods of time.

Correct Answer

verifed

verified

Table 13.6.  Table 13.6.   -Use the information from Table 13.6. If the lot- sizing rule were L4L instead of FOQ = 30 units, what would be the planned order release quantity week 1? A)  0 units B)  10 units C)  20 units D)  40 units -Use the information from Table 13.6. If the lot- sizing rule were L4L instead of FOQ = 30 units, what would be the planned order release quantity week 1?


A) 0 units
B) 10 units
C) 20 units
D) 40 units

Correct Answer

verifed

verified

Planned lead time for items manufactured in- house includes


A) setup time.
B) materials handling and waiting times.
C) process time.
D) all the above

Correct Answer

verifed

verified

Table 13.8 Sunshine Manufacture produces three products, X, Y, and Z. The production of these end items is controlled by an MRP system. Each end item X is assembled with two components of A and one component of B. Each end item of Y is assembled with two components of C and one component of A, each component of C is manufactured from one unit of B. End item Z is assembled from one unit of D and one unit of C, D is manufactured from one unit of A, and C is manufactured from one unit of B. -Use the information in Table 13.8. If item C has a manufacturing lead time of two weeks and a planned receipt of 65 units is needed in week 4, which of the following statements is TRUE?


A) The planned order release in week 2 for item C is 130 units.
B) The gross requirements for item B in week 2 is 65 units.
C) The gross requirements for item B in week 2 is 130 units.
D) The gross requirements for item B in week 4 are at least 65 units.

Correct Answer

verifed

verified

The ability of one piece of software to interact with others is called interoperability.

Correct Answer

verifed

verified

Finite capacity scheduling is an algorithm designed to schedule a group of orders appropriately across the entire shop.

Correct Answer

verifed

verified

Which of the following statements about MRP II is TRUE?


A) It provides more extensive information than MRP because it is tied to the company's financial system.
B) It incorporates informal systems through the use of expert systems technology.
C) It is computationally faster than regular MRP.
D) It is limited only to aiding order- launching decisions.

Correct Answer

verifed

verified

A purchased item is a component received by the company and taken out of inventory.

Correct Answer

verifed

verified

A purchased item has one or more components because it comes from a supplier.

Correct Answer

verifed

verified

The action notice is a


A) secret document to prompt actions to be taken against some suppliers.
B) computer- generated document that helps make decisions about releasing new orders.
C) document that records the most recent important actions taken in the context of MRP.
D) legal notice served by a customer whose order was delayed.

Correct Answer

verifed

verified

A material requirements plan for each component item is generated from the master production schedule and other sources using an MRP explosion.

Correct Answer

verifed

verified

An intermediate item is a subassembly.

Correct Answer

verifed

verified

In MRP, the inventory record divides the future into time periods called time baskets.

Correct Answer

verifed

verified

Table 13.7.  Table 13.7.    -Use the information from Table 13.7. Which lot sizing rule results in the highest average inventory? A)  POQ, P = 3 B)  FOQ = 75 C)  FOQ = 100 D)  L4L -Use the information from Table 13.7. Which lot sizing rule results in the highest average inventory?


A) POQ, P = 3
B) FOQ = 75
C) FOQ = 100
D) L4L

Correct Answer

verifed

verified

An enterprise process is a company- wide process that cuts across functional areas, business units, geographic regions, and product lines.

Correct Answer

verifed

verified

Discuss both the advantages and disadvantages of using an MRP system, which when working, allows a firm to react to even minor changes in production requirements.

Correct Answer

verifed

verified

The advantages are it allows the firm to...

View Answer

MRP can be used to best advantage under which one of the following circumstances?

Correct Answer

verifed

verified

when the item's dema...

View Answer

What are the key inputs to an MRP system?

Correct Answer

verifed

verified

The key inputs are t...

View Answer

Describe how ERP systems are designed.

Correct Answer

verifed

verified

ERP revolves around a single comprehensi...

View Answer

Which one of the following statements concerning MRP is TRUE?


A) The scheduled receipts for a parent item are used to calculate the gross requirements for components of that parent.
B) Some of the key inputs to a computerized MRP system are inventory records, updated bills of material, and a valid master production schedule.
C) One of the main prerequisites for implementing an MRP system is to have products with few BOM levels.
D) Benefits of a successful MRP implementation typically include a decrease in the number of inventory turns, and an increase in the number of expediters.

Correct Answer

verifed

verified