In a process sequence where a product flows from process A to process B, process B is called the contingent process.

Correct Answer

verifed

verified

Shop-floor control (or production activity control) can involve reviewing the status and controlling the progress of orders as they are being worked on.

Correct Answer

verifed

verified

A job has 5 days of processing time left to do before completion, and today is the 10th day of the month. If the job is due on the 14th day of the month, what is its critical ratio?


A) 5
B) 2
C) 0.8
D) 0.5
E) 0.1

Correct Answer

verifed

verified

Assume you are sequencing jobs using Johnson's rule. There are three jobs called A, B, and C. The first step is assembling and the second step is painting. Job A requires 3 hours to assemble and 6 hours to paint. Job B requires 7 hours to assemble and 2 hours to paint. Job C requires 4 hours to assemble and 1 hour to paint. The objective is to minimize the total processing time of all jobs, using Johnson's rule. What is the correct sequence to process the jobs?


A) A-C-B
B) B-C-A
C) B-A-C
D) A-B-C
E) C-B-A

Correct Answer

verifed

verified

Which of the following priority rules used in scheduling the sequence of production is calculated as the slack time remaining in the schedule divided by the number of remaining operations, with the smallest value being run first?


A) STR
B) Johnson's
C) STR/OP
D) LCFS
E) FCFS

Correct Answer

verifed

verified

A shop-floor control system is a system that uses data from the shop floor as well as data processing files to maintain and communicate status information on shop orders and workcenters.

Correct Answer

verifed

verified

The "dollar days" inventory measurement results from a complex algorithm used to compute individual units of inventory and their respective ordering and holding costs.

Correct Answer

verifed

verified

One way to find a bottleneck is to run a capacity resource profile.

Correct Answer

verifed

verified

JIT requires vendors to be located nearby. When compared to synchronous manufacturing, this is viewed as an advantage of JIT.

Correct Answer

verifed

verified

According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?


A) Quality time
B) Break time
C) Research time
D) Just-in-time
E) Idle time

Correct Answer

verifed

verified

Which of the following is a negative aspect of JIT compared to synchronous manufacturing?


A) JIT cannot deal with outside vendors.
B) JIT needs broadly fluctuating production levels.
C) JIT does not allow very much flexibility in the products produced.
D) JIT requires a great deal of workforce computational skills.
E) JIT does not deal well with bottlenecks.

Correct Answer

verifed

verified

The objectives of workcenter scheduling include which of the following?


A) Minimizing worker alienation
B) Providing variety to workforce
C) Following all the priority rules
D) Avoiding trade offs
E) Minimizing setup costs

Correct Answer

verifed

verified

According to the theory of constraints, which of the following is a financial measurement that can be used to measure the firm's ability to make money?


A) Operating expenses
B) Cash flow
C) Inventory
D) Sales
E) Dividends

Correct Answer

verifed

verified

A process batch should be no larger than the transfer batch.

Correct Answer

verifed

verified

Rather than try to adjust the master production schedule to change resource loads, it is more practical to control the flow at each bottleneck or CCR to bring capacities in line.

Correct Answer

verifed

verified

When work has been scheduled in a shop that does not have sufficient resources to complete the schedule on time, the system that generated the schedule is called which of the following?


A) Infinite loading
B) Machine-limited
C) Finite loading
D) Labor-limited
E) Constrained

Correct Answer

verifed

verified

The objective of Johnson's rule for job sequencing is to minimize flow time from the beginning of the first job until the completion of the last job.

Correct Answer

verifed

verified

Scheduling hourly work times using the "first-hour principle" ensures that no excess labor will be used during the work shift.

Correct Answer

verifed

verified

Priority rules are the rules used to obtain a job sequence in production scheduling.

Correct Answer

verifed

verified

Buffer inventory in front of a bottleneck is called a time buffer.

Correct Answer

verifed

verified