The following table contains information about five jobs waiting to be processed at work center number three. The following table contains information about five jobs waiting to be processed at work center number three.   The sequence that would result using the SPT rule is A) e-b-c-d-a. B) c-a-b-e-d. C) a-d-c-e-b. D) d-e-b-a-c. E) e-d-b-a-c. The sequence that would result using the SPT rule is


A) e-b-c-d-a.
B) c-a-b-e-d.
C) a-d-c-e-b.
D) d-e-b-a-c.
E) e-d-b-a-c.

Correct Answer

verifed

verified

Which of the following is the last step in the capacity/scheduling chain?


A) product planning
B) process planning
C) capacity planning
D) aggregate planning
E) scheduling

Correct Answer

verifed

verified

_____ is a technique that managers can utilize in order to minimize the makespan for a group of jobs to be processed on two machines or at two work centers.


A) Smith's rule
B) Hungarian rule
C) Johnson's rule
D) Priority rule
E) Lane's rule

Correct Answer

verifed

verified

Splitting a large lot after one operation beyond a bottleneck operation would reduce the overall waiting time of the bottleneck operation.

Correct Answer

verifed

verified

The theory of constraints has a goal of maximizing flow through the entire system.

Correct Answer

verifed

verified

The following table contains information about five jobs waiting to be processed at work center number three. The following table contains information about five jobs waiting to be processed at work center number three.   Using the EDD rule, the sequence of jobs would be A) d-e-b-a-c. B) a-d-c-b-e. C) e-d-b-a-c. D) a-d-c-e-d. E) e-b-c-d-a. Using the EDD rule, the sequence of jobs would be


A) d-e-b-a-c.
B) a-d-c-b-e.
C) e-d-b-a-c.
D) a-d-c-e-d.
E) e-b-c-d-a.

Correct Answer

verifed

verified

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows:   What is the idle time at the paint work center for the optimal schedule? A) 1 hour B) 2 hours C) 4 hours D) 7 hours E) 10 hours What is the idle time at the paint work center for the optimal schedule?


A) 1 hour
B) 2 hours
C) 4 hours
D) 7 hours
E) 10 hours

Correct Answer

verifed

verified

Line balancing is a major factor in the design and scheduling of low-volume systems because of batch processing.

Correct Answer

verifed

verified

The quantity sent to a bottleneck operation could be split into two or more process batches to better utilize a bottleneck resource rather than process the entire batch.

Correct Answer

verifed

verified

A Gantt chart is a basic scheduling tool that works best for high-volume systems.

Correct Answer

verifed

verified

In theory of constraints scheduling, the __________ refers to the schedule and the __________ refers to inventory used to ensure that the bottleneck is never idle.


A) rope; drum
B) drum; rope
C) drum; buffer
D) buffer; drum
E) buffer; rope

Correct Answer

verifed

verified

Ensuring that the constraining resource is used to its maximum is an example of constraint


A) elevation.
B) subordination.
C) identification.
D) elimination.
E) exploitation.

Correct Answer

verifed

verified

Average completion (flow) time for a schedule sequence at a work center is


A) the sum of processing time divided by the number of jobs.
B) the sum of jobs' flow times divided by the number of jobs.
C) overall flow time divided by total processing time.
D) total processing time plus total late time divided by number of jobs.
E) the sum of flow time plus total late time divided by number of jobs.

Correct Answer

verifed

verified

Which of the following is present in the manufacturing scheduling hierarchy but is absent in the service scheduling hierarchy?


A) aggregate planning
B) materials planning
C) master scheduling
D) detailed, short-term scheduling
E) detailed, short-term planning

Correct Answer

verifed

verified

The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows:   Where in the optimum sequence should car A be scheduled? A) first B) second C) third D) fourth E) fifth Where in the optimum sequence should car A be scheduled?


A) first
B) second
C) third
D) fourth
E) fifth

Correct Answer

verifed

verified

Scheduling in service systems often takes the form of: (I) appointment systems. (II) reservation systems. (III) makespan systems.


A) I only
B) II only
C) I and II only
D) III only
E) I, II, and III

Correct Answer

verifed

verified

In an assignment model where there are fewer jobs than resources


A) dummy jobs are needed to solve the problem.
B) dummy resources are needed to solve the problem.
C) the problem cannot be solved using an assignment model.
D) the problem will have multiple optimum solutions.
E) the simplex method must be used to solve the problem.

Correct Answer

verifed

verified

The SPT priority rule always results in the lowest average completion time.

Correct Answer

verifed

verified

The Hungarian method is limited to a maximum of two jobs per resource.

Correct Answer

verifed

verified

Makespan is the total time needed to complete a group of jobs.

Correct Answer

verifed

verified