A) knowledgeable
B) strict job classifications
C) know more about their job than anyone else
D) empowered
E) All of the above characterize a TPS employee.
Correct Answer
verified
Multiple Choice
A) having too many customers
B) delivery to the point of use
C) having limited ability to respond to changes in product and quality
D) large lot sizes
E) customers' infrequent engineering changes
Correct Answer
verified
Multiple Choice
A) Just-in-time (JIT)
B) Toyota Production System (TPS)
C) Lean operations
D) Material requirements planning (MRP)
E) kanban
Correct Answer
verified
True/False
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Short Answer
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) The quantities in the containers are usually large to reduce setup costs.
B) It is associated with a push system.
C) It is useful to smooth operations when numerous quality problems occur.
D) The supplier workstation signals the customer workstation as soon as a batch is completed.
E) The customer workstation signals to the supplier workstation when production is needed.
Correct Answer
verified
True/False
Correct Answer
verified
Short Answer
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Multiple Choice
A) a push or pull system, depending upon the rate of demand
B) a push system for high margin items and a pull system for low margin items
C) a push system for purchased parts and a pull system for manufactured parts
D) push systems
E) pull systems
Correct Answer
verified
Short Answer
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) that it takes to process one unit at a station
B) between the arrival of raw materials and the shipping of finished products
C) to produce one whole product through an empty system (i.e., with no waiting)
D) required to move orders through the production process, from receipt to delivery
E) none of the above
Correct Answer
verified
Multiple Choice
A) Large lots are pulled from upstream stations.
B) Work is pulled to the downstream stations before it is actually needed.
C) Manufacturing cycle time is increased.
D) Problems become more obvious.
E) None of the above is true of a pull system.
Correct Answer
verified
Multiple Choice
A) $0.45
B) $4.50
C) $45
D) $450
E) $500
Correct Answer
verified
Short Answer
Correct Answer
verified
View Answer
Showing 61 - 80 of 137
Related Exams