Filters
Question type

Study Flashcards

Which of the following statements regarding business process reengineering is NOT correct?


A) Placing decision authority at the lowest level possible tends to reduce bureaucracy.
B) Ideally, only steps that add value to the customer are kept in the redesigned process.
C) Most reengineering is done without the need to invest in new technologies.
D) Reengineering is appropriate when processes simply cannot be improved in small steps.

Correct Answer

verifed

verified

A machine center can produce 175 units per day at 100% utilization.Demand is 75 units per day,and suppliers are capable of delivering raw materials to support production of 125 units per day.If demand doubles,the flow rate will be


A) 100 units.
B) 125 units.
C) 150 units.
D) 175 units.

Correct Answer

verifed

verified

It takes 1 minute to remove a burger from the cooler.The burger is cooked for 2 minutes and requires constant monitoring (the worker cannot do something else during cooking).Cooked burgers are assembled into sandwiches with buns,lettuce,and tomato slices.This step takes 45 seconds per sandwich.Finally,packaging the sandwich takes about 10 seconds.What is the bottleneck in the process? Why?

Correct Answer

verifed

verified


The bottleneck is the cooking operation...

View Answer

A bank has an average of 10 customers per hour arriving into the system,and it takes an average of 30 minutes for the clerk to complete a transaction with a customer.What is the average length of the queue in the bank?


A) 20 customers
B) 5 customers
C) 3 customers
D) None of the above

Correct Answer

verifed

verified

Provide two examples for each of the following categories of good questions to ask when conducting process flow analysis: a.Flow b.Time c.Quantity d.Quality e.Cost

Correct Answer

verifed

verified


a. Flow: Is the transformation process ...

View Answer

The capacity of a process is determined by


A) the bottleneck.
B) the maximum of the required capacity resources.
C) throughput time.
D) none of the above.

Correct Answer

verifed

verified

Symbols used within a typical flowchart include all of the following EXCEPT


A) a trapezoid, representing a work queue.
B) an oval, representing the start or end of a process.
C) an arrow, representing the flow of the work.
D) a rectangle, representing a work activity.

Correct Answer

verifed

verified

If there are multiple resources that process each transaction,then the process capacity is the sum of all the individual capacities of the resources.

Correct Answer

verifed

verified

A process will generally have at least one bottleneck.

Correct Answer

verifed

verified

Flowcharting requires Microsoft Visio or similar flowcharting software.

Correct Answer

verifed

verified

False

Which of the following statements is/are correct? (1) It is important for flowchart analysis to have a specific improvement goal in mind (e) g.,reduce throughput time) . (2) It is important for flowchart analysis to only use the common flowchart symbols When creating the flowchart to avoid any confusion.


A) Only statement (1) is correct.
B) Only statement (2) is correct.
C) Both statements are correct.
D) Both statements are incorrect.

Correct Answer

verifed

verified

A

Fit the following question to the correct category: Are all operational steps or activities necessary?


A) Flow
B) Quantity
C) Quality
D) None of the above

Correct Answer

verifed

verified

Consider the following two statements concerning business process reengineering (BPR) : (1) BPR results are greatest when each function redesigns its own core processes. (2) BPR efforts should be focused on the critical processes required to meet Customers' needs.


A) Only statement (1 ) is correct.
B) Only statement (2) is correct.
C) Both statements are correct.
D) Both statements are incorrect.

Correct Answer

verifed

verified

Process redesign tends to be cross-functional in nature and requires a complete overhaul of work methods,flows,and information systems.

Correct Answer

verifed

verified

Throughput time is


A) the same as the bottleneck.
B) the maximum capacity minus the minimum capacity of a process.
C) the time from when processing begins until a product or service is complete.
D) applicable to customers served in a service process, but not product manufacturing.

Correct Answer

verifed

verified

C

Which of the following would NOT be changed due to process flow analysis?


A) Raw materials
B) Product or service design
C) Job design
D) Customers

Correct Answer

verifed

verified

Analysis of the flow of information


A) is necessary only if management wants tight control of the system.
B) is more important than materials flow.
C) should always accompany an analysis of materials flow.
D) is of concern only to service industries.

Correct Answer

verifed

verified

A diamond symbol in a flowchart indicates


A) evaluation with more than one possible outcome.
B) decision.
C) both (a) and (b) .
D) neither (a) nor (b) .

Correct Answer

verifed

verified

A service blueprint


A) shows all points of interaction between the customer and the service providers.
B) contains a "line of visibility."
C) includes front-office and back-office process flows.
D) has all of the above features.

Correct Answer

verifed

verified

Process elements that might be changed when improving a process include


A) job design.
B) product or service design.
C) equipment or tools.
D) all of the above.

Correct Answer

verifed

verified

Showing 1 - 20 of 44