A) creating buyer/supplier dependence
B) computer-aided design
C) creating transactional relationships
D) continuous improvement
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) continuous
B) controllable
C) customized
D) intermittent
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Multiple Choice
A) process
B) layout
C) capacity
D) resources
Correct Answer
verified
Multiple Choice
A) process manufacturer
B) fixed-position layout
C) closed shop
D) job shop
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) a fixed-position layout
B) a centralized layout
C) a customized layout
D) a static layout
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) a technique for routing that eliminates bottlenecks
B) a quality control process
C) a method for customizing production scheduling
D) a type of reverse auction
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) fixed-position and assembly-line layouts
B) process and product layouts
C) fixed-position and process layouts
D) intermittent and continuous production
Correct Answer
verified
Multiple Choice
A) computer-aided manufacturing
B) computer-aided design
C) just-in-time design
D) flexible manufacturing system
Correct Answer
verified
Multiple Choice
A) They are both tools for computer-aided design.
B) They are both common scheduling tools for complex situations.
C) They both are useful in making sure that all resources are available at the start of a complex project.
D) They are both tools used for evaluating potential site locations.
Correct Answer
verified
Multiple Choice
A) process
B) procedural
C) coordination
D) quality
Correct Answer
verified
Multiple Choice
A) assembly
B) intermittent
C) process
D) product line
Correct Answer
verified
Multiple Choice
A) month-to-month inventory
B) just-in-time inventory
C) coordinating inventory
D) perpetual inventory
Correct Answer
verified
Multiple Choice
A) manufacturing resource planning
B) manufacturing resource planning II
C) enterprise resource planning
D) the PERT chart
Correct Answer
verified
Multiple Choice
A) when production routes are long and complex.
B) when bottlenecks do not exist.
C) when task times are less than one hour.
D) when only a few tasks are involved.
Correct Answer
verified
Showing 1 - 20 of 136
Related Exams