The _____ is the sequence of activities through the network that results in the latest completion date of the project.


A) master schedule
B) alignment process
C) milestone schedule
D) rough order of magnitude
E) critical path

Correct Answer

verifed

verified

Contingency time is also known as _____ time.

Correct Answer

verifed

verified

Which of the following is true about a work breakdown structure WBS) ?


A) Developing a WBS begins by defining and developing lists of all activities needed to accomplish the work of the project.
B) The first draft of the WBS includes activities at the low-level.
C) The first draft of the WBS typically includes the minor activities required to accomplish the deliverables identified in the project scope of work.
D) The WBS is decomposed to the level that the client needs to control the project.
E) Typically, smaller and simpler projects require more detailed WBS.

Correct Answer

verifed

verified

The Gantt chart is also called a PERT chart.

Correct Answer

verifed

verified

Detailed portions of the _____ schedule that affect particular vendors might be sent to them so they can provide detailed activities that they would perform.

Correct Answer

verifed

verified

The process for developing the project logic involves identifying the _____ and _____.


A) lag time; lead time
B) start; finish
C) dependency; autonomy
D) predecessors; successors
E) derivatives; antecedents

Correct Answer

verifed

verified

All of the following are techniques project managers can use to accelerate the project schedule, EXCEPT:


A) improving quality.
B) reassigning resources.
C) changing the scope.
D) adding additional resources.
E) using contingency resources

Correct Answer

verifed

verified

A WBS can be decomposed, that is, separated into basic elements.

Correct Answer

verifed

verified

The characteristics and identifiers of an activity are its _____.

Correct Answer

verifed

verified

People recognize patterns more effectively when they look at lists instead of diagrams.

Correct Answer

verifed

verified

Most activities in a network diagram have a finish-finish relationship.

Correct Answer

verifed

verified

The most detailed versions of the schedule may be developed a few weeks prior to the execution of the major activities and are called _____ plans.


A) procurement
B) two-week
C) contracting
D) project execution
E) risk mitigation

Correct Answer

verifed

verified

The _____ is a technique for graphically displaying the logic of the scheduled activities using boxes and arrows.


A) responsibility matrix
B) precedence diagram method
C) arrow diagramming method
D) critical path method
E) project evaluation and review technique

Correct Answer

verifed

verified

_____ the schedule is a term used to describe the various techniques used to shorten the project schedule.


A) Benchmarking
B) Crashing
C) Decompressing
D) Slacking
E) Floating

Correct Answer

verifed

verified

If the float on activities that are not on the critical path cannot be delayed, it is called free float.

Correct Answer

verifed

verified

Projects with a _____ complexity profile can be managed with lists of activities on paper or by using an outline in word processing or spreadsheet software.

Correct Answer

verifed

verified

The Gantt chart:


A) is usually difficult to read and analyze.
B) is also called a PERT chart.
C) is used to indicate duration and relationships between project activities.
D) illustrates complex relationships well.
E) is a time-scaled graphic that represents each activity with connected straight line segments.

Correct Answer

verifed

verified

Open Source software is always a better choice if an application exists with the features you need because it is free.

Correct Answer

verifed

verified

The _____ is the development of the activity sequence or determining the order in which the activities will be completed.


A) forward pass
B) critical path
C) PDM
D) lead time
E) project logic

Correct Answer

verifed

verified

During the conceptual phase, detail is required in the project schedule.

Correct Answer

verifed

verified