Poka-yolk is a Japanese term used to describe the removal of waste in a lean production system.

Correct Answer

verifed

verified

Waiting for parts to arrive or for machines to finish production is considered a form of waste under the principles of mass production.

Correct Answer

verifed

verified

Kaizen is a Japanese term that means fool proofing to prevent defects.

Correct Answer

verifed

verified

In a pull production system, a card that corresponds to a standard quantity of production is known as a(n)


A) jidoka.
B) andon.
C) kanban.
D) kaizen.

Correct Answer

verifed

verified

Setup time is not a component of the cumulative lead time for a manufactured product.

Correct Answer

verifed

verified

______________ setups can be performed in advance while the machine is running.


A) Internal
B) External
C) Parallel
D) Unnecessary

Correct Answer

verifed

verified